OUR PROCESS

How It Works

A clear, transparent, and efficient process from first conversation to fully operational solar + EV charging system.

01

Discovery & Consultation

We start with a conversation about your property, parking capacity, energy goals, and EV charging needs. Our team assesses your site’s potential and discusses how solar canopies + storage + DC charging can create value for you.

→ Free initial consultation (30–45 mins)
02

Site Assessment & Feasibility

Our engineers visit your property (or conduct a detailed remote assessment) to evaluate structural integrity, solar exposure, electrical infrastructure, and optimal canopy placement. We deliver a clear feasibility report with projected energy production and financial returns.

03

Custom Design & Proposal

We design a tailored system — including canopy layout, solar capacity, battery sizing, and DC charger configuration. You receive a detailed proposal with 3D visualizations, projected ROI, timeline, and available incentives.

04

Engineering, Permits & Approvals

Our team handles all engineering drawings, structural calculations, and works with the City of Calgary and utility providers to secure all necessary permits and grid interconnection approvals.

05

Professional Installation

Certified crews install the solar canopies, battery systems, and DC fast chargers with minimal disruption to your operations. We manage the entire project from foundation to final commissioning.

→ Typical timeline: 8–16 weeks
06

Operation, Monitoring & Support

Once live, your system is monitored 24/7. We provide ongoing maintenance, performance reporting, and optimization. You can track energy production, EV charging revenue, and carbon savings through our client portal.

Ready to start your project?

Book a free consultation with our Calgary team today.

Schedule a Consultation